Combine whose basic operation is the production of electrical energy and coal is the largest company in the Macedonian energy supply system and it is composed of two production units: „Suvodol“ Mine and Thermal Plant and operational unit.

The production in the combine began in 1980, by digging out barren soil from the first BTO system (dredge, belt, disposer), and the first electrical energy was generated in 1982, when the first of the three units of the thermal power plant was started.

REK Bitola has a share of over 72% in the total energy production of the Macedonian energy system.

By opening the new coal mine Brod-Gnietino located in the Pelagonija basin, it is estimated that the operational life of this energy generator will be extended for at least more 15 years.

Contact

JSC "MACEDONIAN POWERPLANTS"
11. Octomber 9
1000 Skopje
Republic of Macedonia

e-mail:contact@elem.com.mk

Energy Map of RM

energetska_mapa

About us

Production and services

Environment

Investing

Contact